Lot 44 Will Reopen Wednesday as Work Continues Nearby

Finishing work on Lot 44
Photo Submitted

Finishing work on Lot 44

Most of the parking spaces in Lot 44, located north of Reynolds Razorback Stadium, will be available to permit-holders Wednesday, Aug. 8.

Some parking spaces in the lot will not be available because work  still being done in the vicinity.

Anyone parking in Lot 44 on Wednesday will need to enter from  Maple Street on the north or from Razorback Road on the west side of the lot.

Those who enter from Razorback Road will be sharing an access point with contractors, so caution will be necessary.

Crosswalks on Stadium Drive will not be available due to ongoing construction. As a matter of safety, anyone wanting to walk from Lot 44 to the heart of campus will need to use the crosswalk on Maple and then walk east along the north side of the street until they are past the construction projects.

Lot 44 will be designated as it was before being closed, with the majority of the spaces set aside for those with yellow faculty and staff permits. There will agian be a limited number of spaces for blue reserved permit-holders.

Construction work on Stadium Drive has not been completed yet, so the east entrance to Lot 44 is closed. The southern portion of the lot will remain fenced off as work continues on the stadium. 

Contacts

David Wilson, Communications Director
Transit and Parking
479-575-6089, dbw010@uark.edu

Headlines

Four Students Named Goldwater Scholars; Two Earn Udall Honorable Mentions

Four U of A students have received the prestigious Goldwater Scholarship, an award for top students in mathematics, science, and engineering.

Cross-Campus Collaboration Culminates in New Outdoor Geological Installation

Grand opening event to celebrate the new GeoLab installation at the U of A’s Gearhart Hall courtyard is set for May 3. The installation will be open to the public year-round.

First Students to Use Online Degree to Hone Nursing Leadership, Elevate Patient Care

Hanna Baxendale and Wendi Kimbrell will begin coursework in the Doctor of Nursing Practice-Executive Master of Business Administration program offered by the Eleanor Mann School of Nursing and Walton College.

Join the Office for Sustainability on a Final Cruise to Campus

Cruise to Campus Wednesdays have fostered a gathering space for individuals interested in biking to campus. Drop by the Old Main Lawn from 7:30-10 a.m. Wednesday for coffee, something to eat and conversation.

Fay Jones School Student Ambassador Program Gives Voice to Design Students

The student ambassador program at the Fay Jones School of Architecture and Design is built to connect top design students with their school, its alumni, its future students and others inside and outside the school.

News Daily