Forward-Thinking Design For Low-Cost Homes

FAYETTEVILLE, Ark - Say "modular home," and you may visualize a vinyl-clad cottage trundling down the highway. This summer University of Arkansas architecture professor Gregory Herman and his students plan to construct a more innovative design statement using 15' x 66' modules provided by Taylor Built Homes, a Fayetteville-based modular housing company. The approximately 1,000-square-foot, $70,000 home, to be located on a southeast Fayetteville lot selected by the city, will provide forward-thinking housing for a family of modest means. Taylor Built Homes has pledged to support the School of Architecture Design/Build workshop with materials and $13,500 to fund student scholarships, design awards, and promotional materials. The finished house will have the following features:

  • groundbreaking design that will generate new ideas and directions for building modular homes
  • 5 star energy efficient rating to keep utility bills low
  • inexpensive air filtration system based on plants and carbon filters designed by NASA engineer

The timeline for the project follows:

Phase One: Design (May 19 - June 6)

  • Students make multiple visits to project site at southwest corner of S. Washington & 12th Sts.
  • On May 23 Design:Build team travels to the Anderson, Mo. factory of Taylor Built Homes' parent company, Taylor Made Homes, to learn more about the fabrication process.
  • Study of modular housing precedents, limitations, and requirements.
  • In-house competition at the UA School of Architecture studio for the design of the house; cash prizes courtesy of Taylor Built Homes awarded to 1st, 2nd, & 3rd place winners.

Phase Two: Construction (June 9 - July 11)

  • Taylor Built Homes completes off-site construction work
  • Students will assist in building foundation for the house and will begin building components and finish details that may include fences, earthworks, porch, screens, etc.
  • Students will visit plant while the house is under construction.

Phase Three (mid-July)

  • Flatbed trucks deliver housing modules to Fayetteville site, where cranes place them on foundation prepared by students. The assembly process will take 1 - 2 days.
  • Students document installation.

Phase Four (late July - early August )

  • Students complete finish work - painting, installing light fixtures, etc.
  • Consultation with City of Fayetteville for subsequent sale to a qualified buyer.
  • Final documentation of project.
Contacts

Greg Herman, professor, School of Architecture, (479) 575-7436; gherman@uark.edu

Robert Patchett, Taylor Built Homes (479) 443-6997; robert@taylorbuilthomes.net

Kendall Curlee, communications coordinator, School of Architecture, (479) 575-4704; kcurlee@uark.edu

Headlines

PetSmart CEO J.K. Symancyk to Speak at Walton College Commencement

J.K. Symancyk is an alumnus of the Sam M. Walton College of Business and serves on the Dean’s Executive Advisory Board.

Faulkner Center, Arkansas PBS Partner to Screen Documentary 'Gospel'

The Faulkner Performing Arts Center will host a screening of Gospel, a documentary exploring the origin of Black spirituality through sermon and song, in partnership with Arkansas PBS at 7:30 p.m. Thursday, May 2.

UAPD Officers Mills and Edwards Honored With New Roles

Veterans of the U of A Police Department, Matt Mills has been promoted to assistant chief, and Crandall Edwards has been promoted to administrative captain.

Community Design Center's Greenway Urbanism Project Wins LIV Hospitality Design Award

"Greenway Urbanism" is one of six urban strategies proposed under the Framework Plan for Cherokee Village, a project that received funding through an Our Town grant from the National Endowment for the Arts.

Spring Bike Drive Refurbishes Old Bikes for New Students

All donated bikes will be given to Pedal It Forward, a local nonprofit that will refurbish your bike and return it to the U of A campus to be gifted to a student in need. Hundreds of students have already benefited.

News Daily